Showing 1–17 of 17 results
/ Date/ Name
Jul 29, 2006Amplitude Dependence of Time of Flight and its Connection to ChromaticityJul 30, 2006Ionization Cooling in all Phase Space Planes with Various Absorber Shapes, Including Parallel-Faced AbsorbersNov 27, 2007A Complete Scheme of Ionization Cooling for a Muon ColliderNov 29, 2007Open Cavity Solutions to the rf in Magnetic Field ProblemSep 18, 2007A Complete Scheme for a Muon ColliderApr 14, 2005The RFOFO Ionization Cooling Ring for MuonsNov 10, 2005A Cost-Effective Design for a Neutrino FactoryOct 6, 2003A Pulsed Synchrotron for Muon Acceleration at a Neutrino FactoryDec 13, 2011Interim Design ReportDec 16, 2002Muon Acceleration with a Very Fast Ramping Synchrotron for a Neutrino FactoryMay 23, 2003A Very Fast Ramping Muon Synchrotron for a Neutrino FactoryJul 12, 2015Concept for a Future Super Proton-Proton ColliderJun 26, 2025Dynamic Focusing to Suppress Emittance Transfer in Crab-Crossing Flat Beam CollisionsApr 30, 2025The Muon ColliderNov 5, 2024MuCol Milestone Report No. 5: Preliminary ParametersMar 15, 2023Towards a Muon ColliderOct 31, 2025MuCol Milestone Report No. 7: Consolidated Parameters